This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
start:hype_file_reference:lakedata.txt [2023/07/07 13:29] cpers |
start:hype_file_reference:lakedata.txt [2024/01/25 11:38] (current) |
||
---|---|---|---|
Line 42: | Line 42: | ||
| ''wamp'' | //m// | //regulation// | //1/5/6/7// | regulation amplitude. Usually larger than water depth given by regvol. Used for scaling computed water stage variation (below threshold) similar to variation of observations. Set to -9999 for not to use. Only for last lakebasin of multi-basin lake. | | | ''wamp'' | //m// | //regulation// | //1/5/6/7// | regulation amplitude. Usually larger than water depth given by regvol. Used for scaling computed water stage variation (below threshold) similar to variation of observations. Set to -9999 for not to use. Only for last lakebasin of multi-basin lake. | | ||
| ''maxQprod'' | //m<sup>3</sup>/s// | //regulation// | //5/6// | maximum allowed production flow. Usually larger than daily production flow. Will reduce the number of spill occations and the spill flow. Only used for lakes with 2 outlets. | | | ''maxQprod'' | //m<sup>3</sup>/s// | //regulation// | //5/6// | maximum allowed production flow. Usually larger than daily production flow. Will reduce the number of spill occations and the spill flow. Only used for lakes with 2 outlets. | | ||
- | | ''minflow'' | //-// | //regulation// | //5/6// | flag for minimum allowed flow. If set to one, the actual minimum flow will be determined by production flow parameters. Only used for lakes with 2 outlets. | | + | | ''minflow'' | //- or m<sup>3</sup>/s// | //regulation// | //1/5/6/7// | For ordinary and multibasin lakes (1/7): minimum flow. For lakes with two outlets (5/6): flag for minimum allowed flow, if set to one, a minimum flow will be determined by production flow parameters. | |
| ''obsflow'' | //-// | //regulation// | //6// | flag for using wanted water transfer flow for second outlet, 0=no (default), 1=yes. Only used for lakes with 2 outlets. | | | ''obsflow'' | //-// | //regulation// | //6// | flag for using wanted water transfer flow for second outlet, 0=no (default), 1=yes. Only used for lakes with 2 outlets. | | ||
- | | ''limqprod'' | //-// | //regulation// | //1/5/7// | water level below which there is reduced production flow from a dam (fraction of regulating volume), the flow reduction is linear to //wmin// (lowest water stage for production flow). Can also be defined in [[start:hype_file_reference:par.txt|par.txt]] | | + | | ''limqprod'' | //-// | //regulation// | //1/5/7// | water level below which there is reduced production flow from a dam (fraction of regulating volume), the flow reduction is linear to zero at //wmin// (lowest water stage for production flow). Can also be defined in [[start:hype_file_reference:par.txt|par.txt]] | |
| ''w0adjdays'' | //days// | //regulation// | //1/5/6/7// | number of days over which a change in seasonal threshold for number of days over which a change in seasonal threshold for regulation with two rating curves (''deltaw0'') is to take place. Can also be defined in [[start:hype_file_reference:par.txt|par.txt]] | | | ''w0adjdays'' | //days// | //regulation// | //1/5/6/7// | number of days over which a change in seasonal threshold for number of days over which a change in seasonal threshold for regulation with two rating curves (''deltaw0'') is to take place. Can also be defined in [[start:hype_file_reference:par.txt|par.txt]] | | ||
| ''builddam'' | //-// | //regulation// | //1/5/6/7// | date (yyyy-mm-dd) when the dam with ''regvol'' was built, before this date only the rating curve will be used for calculating outflow and at this date the lake threshold will be increased | | | ''builddam'' | //-// | //regulation// | //1/5/6/7// | date (yyyy-mm-dd) when the dam with ''regvol'' was built, before this date only the rating curve will be used for calculating outflow and at this date the lake threshold will be increased | |