This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | |||
start:hype_file_reference:mgmtdata.txt [2017/11/08 16:43] cpers |
start:hype_file_reference:mgmtdata.txt [2017/11/09 07:19] cpers |
||
---|---|---|---|
Line 6: | Line 6: | ||
One row is required for each irrigated subbasin, as well as for each subbasin acting as a regional source. | One row is required for each irrigated subbasin, as well as for each subbasin acting as a regional source. | ||
- | One row is required for each water transfer flow, maximum one water transfer per subbasin is allowed. | + | One row is required for each water transfer flow. Maximum one water transfer per subbasin is allowed if demanded flow water transfer time serie is used, otherwise several water transfers may originate in the same lake or end in the same subbasin. |
Columns: | Columns: |