Line 3: Line 3:
 This is a file with an assessment of each subbasin'​s performance,​ or each output region if regional output variables are used. The file is located in the [[start:​hype_file_reference:​info.txt&#​model_options|resultdir]] folder. One file is printed for each [[start:​hype_file_reference:​info.txt:​criteria|performance criterion]] included in the objective function given in [[start:​hype_file_reference:​info.txt|info.txt]]. X is the ordinal number of the performance criterion and the subbasin assessment is calculated for the same variables as that performace criterion. If more than nine criteria are included, the following are denoted by capital letters. Definitions of equations for calculating the criteria is found [[start:​hype_file_reference:​info.txt:​criteria_equations|here]]. This is a file with an assessment of each subbasin'​s performance,​ or each output region if regional output variables are used. The file is located in the [[start:​hype_file_reference:​info.txt&#​model_options|resultdir]] folder. One file is printed for each [[start:​hype_file_reference:​info.txt:​criteria|performance criterion]] included in the objective function given in [[start:​hype_file_reference:​info.txt|info.txt]]. X is the ordinal number of the performance criterion and the subbasin assessment is calculated for the same variables as that performace criterion. If more than nine criteria are included, the following are denoted by capital letters. Definitions of equations for calculating the criteria is found [[start:​hype_file_reference:​info.txt:​criteria_equations|here]].
  
-When ensemble or sequence simulations are made, the results from simulations (I=1 .. //n// or I=sequence number>​0) are written to files named subassX_00I.txt. For a Monte Carlo calibration //n// is defined by ''​num_ens''​ in [[start:​hype_file_reference:​optpar.txt|optpar.txt]]. For a DE calibration //n// is ''​num_ngen''​ plus one, where the first one is a simulation with average ​of the others parameter values. ​+When ensemble or sequence simulations are made, the results from simulations (I=1 .. //n// or I=sequence number>​0) are written to files named subassX_00I.txt. For a Monte Carlo calibration //n// is defined by ''​num_ens''​ in [[start:​hype_file_reference:​optpar.txt|optpar.txt]]. For a DE calibration //n// is ''​num_ngen''​ plus one, where the first one is a simulation with median ​of the others parameter values. ​
  
 For the calculation of criterion for lake water stage, the combination of variables ''​wcom''​ and ''​wstr''​ are exchanged for the internal variables ''​clwc''​ and ''​clws''​ by the program. These variables are the water stages cleaned from ''​w0ref''​ reference level (''​clwc''​=''​wcom''​-''​w0ref'',​ ''​clws''​=''​wstr''​-''​w0ref''​). This makes the criterion calculation more accurate, but note that relative criteria, e.g. relative bias, are relative to the smaller cleaned water stage level. For the calculation of criterion for lake water stage, the combination of variables ''​wcom''​ and ''​wstr''​ are exchanged for the internal variables ''​clwc''​ and ''​clws''​ by the program. These variables are the water stages cleaned from ''​w0ref''​ reference level (''​clwc''​=''​wcom''​-''​w0ref'',​ ''​clws''​=''​wstr''​-''​w0ref''​). This makes the criterion calculation more accurate, but note that relative criteria, e.g. relative bias, are relative to the smaller cleaned water stage level.
Line 47: Line 47:
    ​Subbasin assessment. Criteria is calculated for period 1. Variables: rout, cout  Unit: m3/​s  ​    ​Subbasin assessment. Criteria is calculated for period 1. Variables: rout, cout  Unit: m3/​s  ​
   SUBID NSE CC RE(%) RSDE(%) Sim Rec SDSim SDRec MAE RMSE Bias SDE KGE KGESD KGEM NRMSE ​  NSEW   SUBID NSE CC RE(%) RSDE(%) Sim Rec SDSim SDRec MAE RMSE Bias SDE KGE KGESD KGEM NRMSE ​  NSEW
-  112 0.507 0.721 22.649 -68.38 0.058 0.047 0.068 0.1 0.038 0.07 0.011 -0.032 0.518 0.678 1.226 0.066   0.512 +  112 0.5071 0.721 22.6492 -68.38 0.058 0.0472 0.0681 0.1 0.0385 0.072 0.0131 -0.0132 0.5182 0.6781 1.2265 0.0662   0.5122 
-  135 0.722 0.881 -20.802 0.398 0.308 0.389 0.409 0.407 0.146 0.214 -0.081 0.002 0.76 1.004 0.792 0.075   0.722+  135 0.722 0.8811 -20.802 0.3982 0.3081 0.3887 0.4089 0.4071 0.1464 0.2143 -0.0811 0.0021 0.76 1.004 0.7922 0.0752   0.7223
  