This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
start:hype_file_reference:subassx.txt [2018/02/14 11:26] cpers |
start:hype_file_reference:subassx.txt [2019/04/02 16:20] cpers |
||
---|---|---|---|
Line 47: | Line 47: | ||
Subbasin assessment. Criteria is calculated for period 1. Variables: rout, cout Unit: m3/s | Subbasin assessment. Criteria is calculated for period 1. Variables: rout, cout Unit: m3/s | ||
SUBID NSE CC RE(%) RSDE(%) Sim Rec SDSim SDRec MAE RMSE Bias SDE KGE KGESD KGEM NRMSE NSEW | SUBID NSE CC RE(%) RSDE(%) Sim Rec SDSim SDRec MAE RMSE Bias SDE KGE KGESD KGEM NRMSE NSEW | ||
- | 112 0.507 0.721 22.649 -68.38 0.058 0.047 0.068 0.1 0.038 0.07 0.011 -0.032 0.518 0.678 1.226 0.066 0.512 | + | 112 0.5071 0.721 22.6492 -68.38 0.058 0.0472 0.0681 0.1 0.0385 0.072 0.0131 -0.0132 0.5182 0.6781 1.2265 0.0662 0.5122 |
- | 135 0.722 0.881 -20.802 0.398 0.308 0.389 0.409 0.407 0.146 0.214 -0.081 0.002 0.76 1.004 0.792 0.075 0.722 | + | 135 0.722 0.8811 -20.802 0.3982 0.3081 0.3887 0.4089 0.4071 0.1464 0.2143 -0.0811 0.0021 0.76 1.004 0.7922 0.0752 0.7223 |