User Tools

Site Tools


start:hype_file_reference:subassx.txt

This is an old revision of the document!


respar.txt

This is a file with an assessment of each subbasin's performance. The file is located in the resultdir folder. One file is printed for each performance criterion included in the objective function given in info.txt. X is the ordinal number of the performance criterion and the subbasin assessment is calculated for the same variables as that performace criterion. If more than nine criteria are included, the following are denoted by capital letters.

When ensemble or sequence simulations are made, the results from simulations (I=1 .. n or I=sequence number>0) are written to files named subassX_00I.txt, where n is defined by num_ens in optpar.txt.

File content

The first row defines average period (0=timesteply, 1=daily, 2=weekly, 3=monthly, 4=yearly) used for calculation. This period corresponds to the setting meanperiod in info.txt. Variable names and unit are also listed on row one. The second row is column headings. Thereafter follow subbasins which has observations, one on each row. The data limitation is the same as that of the calibration criteria. Missing values are indicated as -9999.

The columns include:

Header Unit Description
SUBID-subbasin id (as defined in GeoData.txt)
NSE-Nash-Sutcliffe efficiency
CC-Pearson correlation coefficient (part 1 of Kling-Gupta efficiency)
RE(%)%relative bias in mean
RSDE(%)%relative bias in standard deviation
Simin first rowmean of simulated variable
Recin first rowmean of observed variable
SDSimin first rowstandard deviation of simulated variable
SDRecin first rowstandard deviation of observed variable
MAEin first rowmean absolute error
RMSEin first rowroot mean square error
Biasin first rowbias
SDEin first rowbias of standard deviation
KGE-Kling-Gupta efficiency
KGESD-part 2 of Kling-Gupta efficiency (std-quotient)
KGEM-part 3 of Kling-Gupta efficiency (mean-quotient)
NRMSEin first rownormalised root mean square error

Example of subass1.txt:

 Subbasin assessment. Criteria is calculated for period 1. Variables: rout, cout  Unit: m3/s  
SUBID	NSE	CC	RE(%)	RSDE(%)	Sim	Rec	SDSim	SDRec	MAE	RMSE	Bias	SDE	KGE	KGESD	KGEM	NRMSE
112	0.507	0.721	22.649	-68.38	0.058	0.047	0.068	0.1	0.038	0.07	0.011	-0.032	0.518	0.678	1.226	0.066
135	0.722	0.881	-20.802	0.398	0.308	0.389	0.409	0.407	0.146	0.214	-0.081	0.002	0.76	1.004	0.792	0.075
start/hype_file_reference/subassx.txt.1430749920.txt.gz ยท Last modified: 2023/11/16 14:28 (external edit)